ICU Bed Electric Remote Controlled Manufacturer,Supplier and Exporter in India
Product Code : EL-HB-1947
Jlab Export is a leading ICU Bed Electric Remote Controlled Manufacturer,and suppliers in India
Worked from a remote control, this electric ICU bed uses actuators to set the backrest, the knee rest and both the Trendelenburg and reverse Trendelenburg tilts. Its height also changes, from 530 to 760 mm. The steel tube base rolls on centrally locking swivel castors, and the ABS bows come off for access to the patient.
Specifications
| Operation | Electric actuators, remote controlled |
| Movements | Backrest, knee rest, Trendelenburg and reverse Trendelenburg |
| Height | Adjustable, 530 to 760 mm |
| Base and main frame | Steel tubes |
| Castors | 125 mm dia, swivelling, central locking |
| Bows | ABS, removable |
| Fittings | Stainless steel saline rod with four locations, protective railing |
| Finish | Epoxy powder coated |
| Overall size | 2160 L x 1015 W x 530 to 760 mm |
| Minimum order quantity | 1 unit |
| Dispatch time | Usually 14–18 working days |
| Manufacturer | JLab (Jain Laboratory Instruments Pvt Ltd), Ambala, India |
Practicals in the Critical Care Skills Lab
Students set up a full ICU bed space around the bed. They place a Multipara Patient Monitor where the screen can be read from the foot end. A Bed Side Locker-B goes on the side away from the monitor cables. Then they practise each remote movement with a Multi Functional Nursing Manikin in the bed.
A second exercise is the handover check: railing in place, castors locked, remote clipped within reach and saline rod in the correct location. Biomedical students add a cable and plug inspection to the same sheet.
Frequently Asked Questions
What if the remote stops responding?
First check that the bed is plugged in and the supply is switched on, then check the remote itself for damage. If the bed still does not move, take it out of use and call a trained technician.
How should the bed be cleaned without harming the electrics?
Unplug the bed, then wipe the frame, railing and remote with a damp cloth and the disinfectant the hospital uses. Never spray liquid straight onto the actuators or the remote, and let everything dry before plugging it back in.
Why might the bed stay at its lowest height?
An object trapped under the frame or a tripped actuator cut-out can stop the lift. Clear the space under the bed and try again once. A bed that still will not rise needs a technician.
Where does the saline rod fit?
The stainless steel rod drops into any of four locations on the frame. Staff choose the one nearest the line they are setting up, so tubing does not cross the patient.
Which routine checks should biomedical staff make?
Run every movement through its travel and listen for grinding or jerks. Test the central castor lock, the railing fixings and the removable bows, and inspect the mains lead and the remote for wear.
Other ICU and Ward Equipment
For a quote, use Add To Cart or send us a message through the contact page.
Last updated: 12 November 2026
