• +91-85699-09696

Base And Cover Manufacturer,Supplier and Exporter in India

Image Not Found .

Product Code : EL-MWLE-13058
Jlab Export is a leading Base And Cover Manufacturer,and suppliers in India

Base And Cover is a PVC duct that runs along the wall from an air conditioner and keeps the pipe work in one neat channel. The base is fixed to the wall and the cover closes over it. Inside, it carries the insulated refrigerant pipes, the drain pipe and the electric cables. The section is 80 x 60 mm.

Specifications

TypePipe and wiring duct for air conditioner installation
MaterialPVC
Dimension80 x 60 mm
CarriesRefrigerant pipes, thermal insulation, drain pipe, electric cables
PropertiesImpermeable, resists high temperature, oil and UV radiation
Minimum order quantity50 units
Dispatch timeUsually 3–5 working days
ManufacturerJLab (Jain Laboratory Instruments Pvt Ltd), Ambala, India

AC Installation Practicals for Students

In an RAC installation practical, students mark a level route on the wall from the indoor unit to the outdoor unit. They drill the fixing holes with the Power Hand Drill and fix the base through wall plugs with the Screw. The insulated pipes, drain hose and cable are laid in, and the cover is fitted over the base.

Lengths are joined end to end with the Wiring Accessories connection piece of the same 80 x 60 mm size. The run is finished with a Cover Ending where the pipes leave the duct, and a Wall Cover where they pass through the wall.

Frequently Asked Questions

What goes inside the duct?
It carries the insulated refrigerant pipes, the drain pipe and the electric cables of an air conditioner. Keeping them in one closed channel protects them from knocks and weather and keeps the wall tidy.

Can it be fitted on an outside wall?
Yes. The PVC resists UV radiation, oil and high temperature, and water does not pass through it, so it suits the outdoor run between the indoor and outdoor units.

How is the duct fixed to the wall?
Screw the base to the wall through wall plugs at regular spacing, then lay the pipes and cables in. Fit the cover last, once everything inside is in place and the pipe joints have been tested.

How are joints and ends finished?
Straight lengths are joined with an 80 x 60 mm connection piece, and open ends are closed with a matching cover ending. Where the pipes enter the building, a wall cover finishes the hole.

How do I check that everything fits inside?
Lay the insulated pipes, drain and cable in a short open length of base before fixing the whole run. If the cover will not close without crushing the insulation, the pipe bundle is too large for this size.

Other AC Installation Supplies

For a quote, use Add To Cart or send us a message through the contact page.

Last updated: 5 November 2026


   

Office Address

Works: 2475-84,
Hargolal Road,Ambala, Haryana

[email protected]

+91-85699-09696

Follow Us