• +91-85699-09696

Prong Plate Manufacturer,Supplier and Exporter in India

Prong Plate

Product Code : EL-SM-8879
Jlab Export is a leading Prong Plate Manufacturer,and suppliers in India

In the shrinkage limit test, the volume of a dried soil pat is found from the liquid it displaces. This clear acrylic plate carries three rust-resistant metal prongs that push the pat fully under the liquid surface. It comes with a shrinkage dish, in which the wet pat is formed and dried, and a crystallizing dish.

Specifications

PlateAcrylic plastic
Prongs3, rust-resistant metal
ConstructionRust resistant
UseImmersing the dry soil pat in the shrinkage limit test
Supplied withShrinkage dish and crystallizing dish
Minimum order quantity10 units
Dispatch timeUsually 4–6 working days
ManufacturerJLab (Jain Laboratory Instruments Pvt Ltd), Ambala, India

Shrinkage Limit Practicals

Students fill the lightly greased shrinkage dish with soil paste wetter than its liquid limit, tapping it to drive out air, and weigh it. The pat dries slowly in air, then in a Laboratory Bench Oven, and is weighed dry on an Electronic Balance. The volume of the dish gives the wet volume V.

The prong plate then gives the dry volume Vd. The shrinkage limit is w minus (V minus Vd) times the density of water, divided by the dry mass. The full Shrinkage Limit Set adds the glass cup and evaporating dish, and its readings also give the shrinkage ratio and volumetric shrinkage.

Frequently Asked Questions

How does the prong plate measure the pat volume?
The cup is filled to the brim and levelled. The dry pat is laid on the liquid and the prongs press it under until the plate rests on the rim. The liquid pushed over the rim has the same volume as the pat.

Which liquid is used to immerse the pat?
In the classic method the pat displaces mercury, a dense liquid metal that does not soak into dry soil. Mercury is toxic, so some labs measure the pat volume by a wax coating method instead, following their own test standard.

Why does the plate have three prongs?
Three points hold the pat level and push it down evenly without breaking it. They also let the plate sit firmly on the cup rim, so the pat is fully under the surface each time.

Why is the shrinkage dish greased before it is filled?
A thin film of petroleum jelly stops the soil sticking to the dish as it dries and shrinks. The pat then pulls away cleanly and comes out whole for the volume reading. Weigh the dish after greasing it, so the grease is not counted as soil.

What mistakes give a wrong shrinkage limit?
Air trapped in the wet pat, a pat that cracks because it was dried too fast, and air caught under the pat as it is pushed down. Check that the pat is whole and fully covered before reading.

Other Soil Plasticity Apparatus

For a quote, use Add To Cart or send us a message through the contact page.

Last updated: 6 November 2026


   

Office Address

Works: 2475-84,
Hargolal Road,Ambala, Haryana

[email protected]

+91-85699-09696

Follow Us